Search another route:           

Travel information for Interstate 80 is as follows:

Last update at: May 24, 2022 03:11 pm
Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 1 (Southeast)  
District 3 (Southwest) WY22: Weight limit of 60,000 GVW is in effect over Teton Pass between Jackson and the Idaho state line from milepost 7 to 17.

WY372: Open range near La Barge from milepost 12 to 48, Proceed with caution.

WY 390: Vehicle Restrictions in effect near Jackson at milepost 7.7. Narrow road. No vehicles over 23 ft. 4 in. length and over 8 ft. 4 in width. No Trailers allowed. Use alternate route.

US 30: Watch for falling rocks between Cokeville and Kemmerer from milepost 35 to 40, Proceed with caution.

US 189: Watch for wildlife and falling rock near La Barge from milepost 61 to 106.

 


Conditions
Nearest Town Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Evanston
NWS Forecast
Between the Utah State Line and Evanston Dry None   May 24, 2022 12:41 pm
Between Evanston and Exit 18, US 189 Dry None   May 24, 2022 12:41 pm
Between Exit 18, US 189 and Exit 30, Bigelow Rd Dry None   May 24, 2022 12:41 pm
Lyman
NWS Forecast
Between Exit 30, Bigelow Rd and Exit 39, WY 412/414 Dry None   May 24, 2022 12:41 pm    
Between Exit 39, WY 412/414 and MM 57, Sweetwater County Line Dry None   May 24, 2022 12:41 pm
Granger
NWS Forecast
Between MM 57, Uinta County Line and Exit 66, Granger Jct Dry None   May 24, 2022 12:41 pm
Between Exit 66, Granger Jct and Exit 83, La Barge Rd Dry None   May 24, 2022 12:41 pm
Rock Springs
NWS Forecast
Between Exit 83, La Barge Rd and Exit 91, Flaming Gorge Way Dry None   May 24, 2022 12:41 pm
Between Exit 91, Flaming Gorge Way and Exit 104, Rock Springs Dry None   May 24, 2022 12:41 pm    
Between Exit 104, Rock Springs and Exit 111, Airport and Baxter Roads Dry None   May 24, 2022 12:41 pm  
Between Exit 111, Airport and Baxter Roads and Point of Rocks Dry None   May 24, 2022 12:41 pm
Patrick Draw
NWS Forecast
Between Point of Rocks and Exit 142, Bitter Creek Dry None   May 24, 2022 12:41 pm
Between Exit 142, Bitter Creek and Exit 158, Tipton Rd Dry None   May 24, 2022 12:41 pm
Wamsutter
NWS Forecast
Between Exit 158, Tipton Rd and Wamsutter Dry None   May 24, 2022 12:41 pm  
Between Wamsutter and Exit 187, Creston Jct Dry None   May 24, 2022 12:41 pm
Rawlins
NWS Forecast
Between Exit 187, Creston Jct and Rawlins Dry None   May 24, 2022 03:11 pm
Between Rawlins and Exit 235, Walcott Jct Dry None   May 24, 2022 03:11 pm
Elk Mountain
NWS Forecast
Between Exit 235, Walcott Jct and Exit 255, WY 72 Dry None   May 24, 2022 03:11 pm
Between Exit 255, WY 72 and Exit 267, Wagonhound Rd Wet with Rain None   May 24, 2022 03:11 pm
Arlington
NWS Forecast
Between Exit 267, Wagonhound Rd and Arlington Wet with Rain None   May 24, 2022 03:11 pm
Between Arlington and Exit 279, Cooper Cove Rd Wet with Rain None   May 24, 2022 03:11 pm
Laramie
NWS Forecast
Between Exit 279, Cooper Cove Rd and Exit 290, Quealy Dome Dry None   May 24, 2022 03:11 pm
Between Exit 290, Quealy Dome and Laramie Dry None   May 24, 2022 03:11 pm
Between Laramie and Exit 323, Happy Jack Rd Wet with Snowfall None   May 24, 2022 03:11 pm  
Between Exit 323, Happy Jack Rd and Exit 335, Buford Wet with Snowfall None   May 24, 2022 03:11 pm
Cheyenne
NWS Forecast
Between Exit 335, Buford and Exit 348, Otto Rd Wet with Rain None   May 24, 2022 03:11 pm
Between Exit 348, Otto Rd and Exit 359, Junction I-25 Dry None   May 24, 2022 03:11 pm
Between Exit 359, Junction I-25 and Exit 364, College Drive Dry None   May 24, 2022 03:11 pm    
Between Exit 364, College Drive and Exit 370, Archer Interchange Dry None   May 24, 2022 03:11 pm    
Between Exit 370, Archer Interchange and Exit 377, WY 217 Dry None   May 24, 2022 03:11 pm
Pine Bluffs
NWS Forecast
Between Exit 377, WY 217 and Pine Bluffs Dry None   May 24, 2022 03:11 pm  
Between Pine Bluffs and the Nebraska State Line Dry None   May 24, 2022 03:11 pm  

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Town(s) Milepost(s) Surface Delays Last Updated
I-80 Rock Springs East mp 105-120 I802208 I802210 Brad McCullough
352-3036(c) 522-8948
IHC Scott
Centennial, CO
303-279-0900
2022-Mar-14 2023-Jul-31 Minor reconstruction, bridge removal and replacement and placement of concrete pavement in the EB lane. Two-way traffic will be carried in the WB lane while EB is under construction. Width restriction of 16 ft in place.   105 to 120.5 Paved Construction zone speed limit 65 MPH Apr 16, 2022 04:53 am
District 3 Bridge Rehabilitation STP-BR-B213030 Damon Newsome
307-783-6801
damon.newsome@wyo.gov
Coldwater Group Inc
,
801-745-7091
2022-Apr-01 2022-Jul-31 Grading, bituminous pavement surfacing, lane rental, bridge rehabilitation and miscellaneous work at various locations in Transportation District 3.   10.68 to 10.69 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  10.68 to 10.69 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  10.68 to 10.69 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  13.86 to 13.87 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  13.86 to 13.87 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  13.86 to 13.87 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  15.63 to 15.64 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  15.63 to 15.64 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  15.63 to 15.64 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  61.58 to 61.59 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  61.58 to 61.59 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
  61.58 to 61.59 Paved Construction zone speed limit 45 MPH May 03, 2022 09:30 pm
Bridge and pavement work on I-80 in west Laramie Milepost 310-313 n/a 2022-May-31 2022-Dec-31 Bridge and pavement work on I-80 in west Laramie Milepost 310-313   310 to 313 Paved Expect delays May 23, 2022 02:29 pm
District 3 Contact Patching I-80, US 26, WY 239, WY 232, US 30 and US 189 STP-PM-B223028 Darrin Robinson
307-248-0476
Lewis & Lewis Inc.
Rock Springs, WY
307-362-7948
2022-May-23 2022-Jun-23 Milling and overlay in various locations through District 3 including I-80 mp 130-173 US 26/89 mp 138-140, WY 239 mp 0-1.64, WY 232 mp 9-11.4, US 30 mp 26.2 - mp 45 and US 189 mp 111.3 - 117/.7. Expect minor delays.   130.4 to 173 Paved Expect delays Apr 28, 2022 09:28 am
Laramie -Cheyenne, Vedauwoo West NHF-1805177 Steve Cook
307-760-2595
Simon Contractors - Laramie
Laramie, WY
307-760-4022
2022-May-03 2023-Jun-30 Milling plant mix, Bituminous pavement surfacing, plant mix wearing course, bridge rehabilitation and miscellaneous work on approximately 6.20 miles of I-80 in both EBL and WBL beginning at RM 324.07 between Laramie and Cheyenne   324.07 to 330.24 Paved Construction zone speed limit 45 MPH
Expect delays
May 03, 2022 08:21 am
Rock Springs - Bitter Creek Section I-80 milepost 138-143 I803147 Clint- Office Lockman
307-352-3039
HK Contractors, Inc.
Idaho Falls, ID
208-523-6600
2022-Mar-24 2022-Aug-31 Pavement overlay and bridge rehabilitation with reduced speeds of 65mph and 45 mph during periods of work on weekdays.   138 to 143 Paved Construction zone speed limit 65 MPH May 04, 2022 03:25 pm
Rawlins - Laramie (Arlington Section) 80 mp 267 - 275 NHPPI-I804264 Kory Cramer
307-745-2137
2022-Apr-18 2023-Oct-31 Milling plant mix, bituminous pavement surfacing (recycle), high performance wearing course, bridge rehabilitation and miscellaneous work on approximately 8.20 miles on both EBL and WBL on I-80 beginning at RM 267.19 between Rawlins and Laramie.   267.19 to 275 Paved Expect delays May 20, 2022 04:41 pm
  267.19 to 275 Paved Expect delays May 20, 2022 04:41 pm
I-80 Fort Steele to Laramie I804271 Aaron Spenny
328-4104 or 321-6517
Simon Contractors and Subsidiaries
Cheyenne, WY
307-632-7900
2020-Oct-20 2023-Sep-15 I-80 Winter Freight project will bring nearly 100 new semitruck parking spaces to both the Fort Steele Rest Area about 7 miles east of Sinclair (mile marker 228) and at the Quealy Dome truck parking area 20 miles west of Laramie (mm 290) for a total of almost 200 new spaces. Additionally, semitruck climbing lanes will be installed on 2 miles of I-80 eastbound over Halleck Ridge (about 8 miles west of Elk Mountain, between mm 250.5-252.5) and about 2 miles of I-80 westbound between Cooper Cove and Quealy Dome (mm 279.5-281.5) near the Albany County line. Motorists on I-80 between Laramie and Rawlins will see minimal impacts. The Fort Steele Rest Area will remain closed during I-80 Winter Freight project construction. Please do not park on the on- and off-ramps of the interstate as it will potentially impede work in the area.   227.9 to 228 Paved None May 04, 2022 07:54 am
  279.5 to 281.5 Paved Expect delays May 04, 2022 07:54 am
Rock Springs Streets I-80 Interchange/Interchange Road mp 99.5-102.5 INFRA-I802220, STPU-RO-B123014, & ARSCT-B123A0 Brad McCullough
352-3036(c) 522-8948
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2021-Mar-08 2023-Jun-30 Construction of a new I-80 interchange at MP 101.16 and new connector from I-80 to Blairtown Road (Sweetwater County Road 51). New structures and concrete/asphalt surfacing will be constructed through the duration of the project. A width restriction of 16 feet is in effect throughout the project. Expect closures at the Sunset Interchange.   99.5 to 102.5 Paved Construction zone speed limit 65 MPH Apr 06, 2022 09:23 am
Rawlins-Laramie (Halleck Bridge West WBL) NHPPI-I804270 Aaron Spenny
328-4104 or 321-6517
Simon Contractors - Laramie
Laramie, WY
307-760-4022
2022-May-01 2022-Oct-31 Grading, bituminous pavement surfacing (recycle), plan mix wearing course, bridge rehabilitation, guardrail and miscellaneous work on 6.80 miles of I-80.   245.9 to 252.6 Paved Construction zone speed limit 45 MPH May 20, 2022 02:04 am
  245.9 to 252.6 Paved Construction zone speed limit 45 MPH May 20, 2022 02:04 am
  245.9 to 252.6 Paved Construction zone speed limit 45 MPH May 20, 2022 02:04 am

*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.


Contact Us
Copyright 2021 Disclaimer Privacy Policy Media