Travel information for Interstate 80 is as follows:

Last update at: Jun 24, 2021 12:10 pm
Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 1 (Southeast)  
District 3 (Southwest) WY22: Weight limit of 60,000 GVW in effect and brake checkpoints over Teton Pass between Jackson and the Idaho state line, from milepost 7 to 17.

WY390: Vehicle Restrictions in effect near Jackson at milepost 7.7. Narrow road. No vehicles over 23 ft. 4 in. length and over 8 ft. 4 in width. No trailers allowed. Use alternate route.

I80: Road damage, Exit closed WESTBOUND near Wamsutter at milepost 170, Use alternate route.

 


Conditions
Nearest Town Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Evanston
NWS Forecast
Between the Utah State Line and Evanston Dry None   Jun 24, 2021 12:01 pm
Between Evanston and Exit 18, US 189 Dry None   Jun 24, 2021 12:01 pm
Between Exit 18, US 189 and Exit 30, Bigelow Rd Dry None   Jun 24, 2021 12:01 pm
Lyman
NWS Forecast
Between Exit 30, Bigelow Rd and Exit 39, WY 412/414 Wet None   Jun 24, 2021 12:01 pm    
Between Exit 39, WY 412/414 and MM 57, Sweetwater County Line Wet None   Jun 24, 2021 12:01 pm
Granger
NWS Forecast
Between MM 57, Uinta County Line and Exit 66, Granger Jct Dry None   Jun 24, 2021 12:01 pm
Between Exit 66, Granger Jct and Exit 83, La Barge Rd Dry None   Jun 24, 2021 12:01 pm
Rock Springs
NWS Forecast
Between Exit 83, La Barge Rd and Exit 91, Flaming Gorge Way Dry None   Jun 24, 2021 12:01 pm
Between Exit 91, Flaming Gorge Way and Exit 104, Rock Springs Dry None   Jun 24, 2021 12:01 pm    
Between Exit 104, Rock Springs and Exit 111, Airport and Baxter Roads Dry None   Jun 24, 2021 12:01 pm  
Between Exit 111, Airport and Baxter Roads and Point of Rocks Dry None   Jun 24, 2021 12:01 pm
Patrick Draw
NWS Forecast
Between Point of Rocks and Exit 142, Bitter Creek Dry None   Jun 24, 2021 12:01 pm
Between Exit 142, Bitter Creek and Exit 158, Tipton Rd Dry None   Jun 24, 2021 12:01 pm
Wamsutter
NWS Forecast
Between Exit 158, Tipton Rd and Wamsutter Dry None   Jun 24, 2021 12:01 pm  
Between Wamsutter and Exit 187, Creston Jct Dry None   Jun 24, 2021 12:01 pm
Rawlins
NWS Forecast
Between Exit 187, Creston Jct and Rawlins Dry None   Jun 24, 2021 12:10 pm
Between Rawlins and Exit 235, Walcott Jct Dry None   Jun 24, 2021 12:10 pm
Elk Mountain
NWS Forecast
Between Exit 235, Walcott Jct and Exit 255, WY 72 Dry None   Jun 24, 2021 12:10 pm
Between Exit 255, WY 72 and Exit 267, Wagonhound Rd Dry None   Jun 24, 2021 12:10 pm
Arlington
NWS Forecast
Between Exit 267, Wagonhound Rd and Arlington Dry None   Jun 24, 2021 12:10 pm
Between Arlington and Exit 279, Cooper Cove Rd Dry None   Jun 24, 2021 12:10 pm
Laramie
NWS Forecast
Between Exit 279, Cooper Cove Rd and Exit 290, Quealy Dome Dry None   Jun 24, 2021 12:10 pm
Between Exit 290, Quealy Dome and Laramie Dry None   Jun 24, 2021 12:10 pm  
Between Laramie and Exit 323, Happy Jack Rd Dry None   Jun 24, 2021 12:10 pm  
Between Exit 323, Happy Jack Rd and Exit 335, Buford Dry None   Jun 24, 2021 12:10 pm
Cheyenne
NWS Forecast
Between Exit 335, Buford and Exit 348, Otto Rd Dry None   Jun 24, 2021 12:10 pm
Between Exit 348, Otto Rd and Exit 359, Junction I-25 Dry None   Jun 24, 2021 12:10 pm
Between Exit 359, Junction I-25 and Exit 364, College Drive Dry None   Jun 24, 2021 12:10 pm    
Between Exit 364, College Drive and Exit 370, Archer Interchange Dry None   Jun 24, 2021 12:10 pm    
Between Exit 370, Archer Interchange and Exit 377, WY 217 Dry None   Jun 24, 2021 12:10 pm
Pine Bluffs
NWS Forecast
Between Exit 377, WY 217 and Pine Bluffs Dry None   Jun 24, 2021 12:10 pm  
Between Pine Bluffs and the Nebraska State Line Dry None   Jun 24, 2021 12:10 pm  

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Town(s) Milepost(s) Surface Delays Last Updated
I-80 Quealy Dome West Laramie, 282-292 I805177 Steve Cook
307-760-2595
Simon Contractors and Subsidiaries
Cheyenne, WY
307-632-7900
2020-Oct-20 2022-Oct-30 Thursday, June 10, 2021, Traffic Safety Services and S&S Builders will be switching lane closures for the EBL of I80 between RM 282 and RM 292. Each of the Bridges located at RM 285.09, 288.62, and 290.44 have Temporary Concrete Barriers that will be shifted to accommodate the lane closure change. Speed reductions will be set to 45 mph and will be accompanied by flaggers at each of the bridge locations. Currently, the Passing lane is closed, but after the switch, the driving lane will be closed and traffic will use the passing lane to travel east.   282 to 292 Paved Construction zone speed limit 45 MPH
Left lane closed
Jun 15, 2021 06:29 am
Pavement marking project in Laramie County D1 Pavement Marking Wayne Shenefelt
307-630-8462
Streamline Markings, Inc.
Billings, MT
406-252-3546
2021-Jun-07 2021-Jul-31 work will start Monday on Interstate 80 between mile markers 362-372.4, or between the Interstate 180/Central Ave./South Greeley Highway interchange and just east of the Archer interchange. Other locations where markings will be installed include: I-80 between east of Vedauwoo and Roundtop Road, or mm 330.24-357.7. Interstate 25 between the Colorado state line and the Randall Avenue interchange, or mm 0-11.59. U.S. 85/South Greeley Highway between WYO 212/College Drive and Fox Farm Road, or mm 7.3-8.3 The new stripes and pavement markings. This is a mobile operation with striping equipment moving at slow speeds. Be prepared to slow down to give the crews plenty of space to work and the materials time to properly dry. No passing is allowed within the coned area behind the operation due to wet striping materials. Motorists through any of the above areas should stay alert and expect potential delays from this project, which is expected to be complete in July 2021.   330.24 to 357.7 Paved Expect delays Jun 17, 2021 09:34 pm
Rock Springs - Rawlins (Rock Springs East (WBL) NHPPI-I802204 Brad McCullough
352-3036(c) 522-8948
Interstate Highway Construction, Inc.
Englewood, CO
303-790-9100
2021-Mar-08 2021-Nov-30 Minor reconstruction, bridge removal and replacement, rock scaling and placement of concrete pavement in the westbound lane. Two-way traffic will be carried in the eastbound lane while the westbound lane is under construction. A width restriction of 16 feet is in effect throughout the project.   105.5 to 120.5 Paved Construction zone speed limit 65 MPH Jun 10, 2021 09:12 pm
I-80 EB MP 95.5-99 rd work n/a Damon Newsome
307-783-6801
2021-Jun-23 2021-Jun-25 I-80 EB MP 95.5-99 rd work beginning at 21:30 on 23-JUNE   95.5 to 99 Paved Construction zone speed limit 10 MPH
Expect delays
Left lane closed
Jun 22, 2021 02:15 pm
I-80 Sinclair to Walcott NHPPI-1804267 and I804268 Jake Lonn
307-328-4103
McGarvin-Moberly Construction Co.
Worland, WY
307-347-4268
2021-Mar-04 2021-Oct-31 Grading, milling plant mix, bituminous pavement surfacing, plant mix wearing course, bridge rehabilitation and miscellaneous work. There will be head to head traffic on I-80 in the Westbound lanes with a speed limit of 65 mph. Width restriction on WYO 76 between RM 222.13 to RM 222.23 has been lifted. There are milled surfaces on EBL on and off ramps at exit 221.   221 to 228 Paved Construction zone speed limit 65 MPH Jun 15, 2021 06:31 am
I-80 MP 310-313 Bridge Rehabilitation I805175 Kory Cramer
307-745-2137
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2021-Mar-29 2021-Oct-31 Bituminous pavement surfacing, high performance wearing course, concrete slab replacement, sealing joints, bridge rehabilitation and miscellaneous work on approximately 3.9 miles of I-80 beginning at the intersection of Third St and Curtis in Laramie.   310 to 313 Paved Expect delays May 28, 2021 08:39 pm
I-80mp 372-382 Hillsdale Bridge Replacement NHPPI-I806209 Kevin Erickson
3076318322
kevin.erickson@wyo.gov
Simon Contractors and Subsidiaries
Cheyenne, WY
307-632-7900
2020-Apr-27 2021-Oct-31 Grading, draining, placing crushed base and bituminous pavement surfacing, plant mix wearing course, removal and replacement of two bridges , bridge rehabilitations and miscellaneous work on approximately 9.8 miles of I-80.   372 to 382 Paved Expect delays Jun 18, 2021 01:23 am
I-80 Fort Steele to Laramie, 250-253 and 282-279 I804271 Aaron Spenny
328-4104 or 321-6517
Simon Contractors and Subsidiaries
Cheyenne, WY
307-632-7900
2020-Oct-20 2022-Oct-30 I-80 Winter Freight project will bring nearly 100 new semitruck parking spaces to both the Fort Steele Rest Area about 7 miles east of Sinclair (mile marker 228) and at the Quealy Dome truck parking area 20 miles west of Laramie (mm 290) for a total of almost 200 new spaces. Additionally, semitruck climbing lanes will be installed on 2 miles of I-80 eastbound over Halleck Ridge (about 8 miles west of Elk Mountain, between mm 250.5-252.5) and about 2 miles of I-80 westbound between Cooper Cove and Quealy Dome (mm 279.5-281.5) near the Albany County line. Motorists on I-80 between Laramie and Rawlins will see minimal impacts. The Fort Steele Rest Area will remain closed during I-80 Winter Freight project construction. Please do not park on the on- and off-ramps of the interstate as it will potentially impede work in the area. There will be some short lane closures in the east bound lane around RM 251 to RM 253   228 to 228 Paved None May 03, 2021 08:06 am
  250.5 to 252.5 Paved May 03, 2021 08:06 am
  279.5 to 281.5 Paved Expect delays May 03, 2021 08:06 am
District 1 Bridge Rehab STP-BR-B211011 Kory Cramer
307-745-2137
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2021-Jun-21 2021-Oct-31 Bituminous pavement surfacing, bridge rehabilitation and miscellaneous work at various locations in Transportation District 1.   190 to 402 Paved None Jun 22, 2021 09:58 am
Rock Springs Streets (I-80 Interchange/Interchange Road) INFRA-I802220, STPU-RO-B123014, & ARSCT-B123A0 Brad McCullough
352-3036(c) 522-8948
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2021-Mar-08 2023-Jun-30 Construction of a new I-80 interchange at MP 101.16 and new connector from I-80 to Blairtown Road (Sweetwater County Road 51). New structures and concrete/asphalt surfacing will be constructed through the duration of the project. A width restriction of 16 feet is in effect throughout the project.   99.5 to 102.5 Paved Construction zone speed limit 65 MPH May 25, 2021 07:50 am
I805175 2021-Apr-05 2021-Oct-31   309.93 to 313.83 Paved None Apr 07, 2021 11:16 am
D3 Bridge Rehabilitation Project I-80 mp 97 and WY 374 mp 83 B213030 Damon Newsome
307-783-6801
Coldwater Group Inc
,
801-745-7091
2021-Apr-14 2022-Jul-31 Various bridge rehabilitation work on the bridge at mp 97 on I-80 EB and WY 374 mp 83.   97.05 to 97.05 Paved Jun 10, 2021 05:35 pm
I-80 mp 252-258 Paving Elk Mountain I-80elkmountainroadwork Aaron Spenny
328-4104 or 321-6517
Knife River Corporation and subsidiaries
Sioux City, IA
712-252-2766
2021-May-24 2021-Oct-31 Paving and miscellaneous roadwork on approximately 6 miles of I-80.   252 to 258 Paved, Milled Expect delays May 25, 2021 11:35 am

*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.